Stability calculation for floating equipment: what does ES-TRIN require?

A pontoon with a crane or hydraulic excavator is, as a rule, floating equipment. For such equipment ES-TRIN has a chapter of its own with requirements for safety clearance, freeboard and stability. This article explains what that means and what a stability calculation can contribute.

The short answer. Under ES-TRIN (Article 1.01, item 1.22) floating equipment is a floating installation carrying working gear such as cranes, dredging equipment, pile drivers or elevators. A pontoon with a crane or hydraulic excavator is, as a rule, floating equipment. Chapter 22 of ES-TRIN sets the special requirements: sufficient residual safety clearance and residual freeboard, a sum of heel and trim of at most 10° and a proof of stability (Article 22.07). A stability calculation can form part of that proof; it is not the proof itself.

What is floating equipment?

ES-TRIN is the European technical standard for inland navigation vessels. Article 1.01, item 1.22 describes floating equipment as a floating installation carrying working gear such as cranes, dredging equipment, pile drivers or elevators. A pontoon, or an assembly of modular pontoons, with a crane or hydraulic excavator generally fits that description and therefore falls under Directive (EU) 2016/1629. Whether your assembly is treated that way, and which requirements apply, is decided by the inspection body or the competent authority.

Which requirements does chapter 22 set?

Chapter 22 of ES-TRIN contains the special provisions for floating equipment. For stability these are the main articles:

Article 22.10 allows floating equipment without a proof of stability if the working gear can in no way alter the heeling or trim and any displacement of the centre of gravity can be absolutely excluded. For a crane or hydraulic excavator on a pontoon that is, in principle, not the case.

What does the proof of stability contain?

Article 22.07 paragraph 2 names six parts (a to f): scale drawings, hydrostatic data or curves, the righting lever curves for static stability where required, a description of the operating conditions with weight and centre of gravity, the calculation of the moments and the resulting angles, safety clearances and freeboards, and an overview of the results with the limits of use and loading. How that ends up in a file is explained in why an inspection looks at ES-TRIN.

Who assesses it?

A stability calculation is evidence, not a verdict. Whether an assembly is accepted is decided by an expert or the competent authority. The inspection body may allow deviations in certain cases (Article 22.05 paragraph 4). National requirements of the country or of the competent authority may be stricter.

What StabCal does and does not calculate

For each scenario of the work cycle StabCal™ calculates parts of the proof of stability for the assembly you enter: the hydrostatic data, the operating conditions with weight and centre of gravity, the moments with the angles of heel and trim, the residual freeboard to the deck edge and, in the reduced-freeboard check, the safety clearance to the openings you specify on the drawing area, plus an overview of the results. StabCal checks the sum of heel and trim against the 10° of Article 22.07. StabCal calculates the stability curve (GZ curve) per scenario; it is decisive for reduced freeboard under 22.08. The scale drawings of the equipment (part a) are supplied by the user.

StabCal does not perform a heeling test or a draught check (Article 22.06) and does not check the tipping stability of the machine, waves, or the safety clearance to openings you do not specify.

StabCal checks, per scenario, the criteria from ES-TRIN 2025/1 chapter 22 that are built into StabCal, as far as StabCal can calculate them. Whether an assembly of pontoons is accepted in your situation is decided by an expert or the competent authority; national requirements of the country or of the competent authority may be stricter. StabCal does not give an approval, a declaration of conformity with ES-TRIN or a proof of stability within the meaning of Article 22.07 paragraph 2; a StabCal calculation can form part of that proof. For wind, StabCal uses the specific wind pressure of 0.25 kN/m² under Article 22.07 paragraph 5, with the shape-dependent coefficient of resistance 1.6 (the value for solid-section structures) for all surfaces, and in 24 wind directions instead of only athwartships; that is not more favourable than that paragraph. The safety clearance to openings you do not specify, the tipping stability of the machine, deck pressure, couplings, ground contact and waves are outside the calculation.

Sources

Frequently asked questions

Is a pontoon with an excavator floating equipment?

As a rule, yes. ES-TRIN (Article 1.01, item 1.22) describes floating equipment as a floating installation carrying working gear such as cranes, dredging equipment, pile drivers or elevators; a pontoon with a crane or hydraulic excavator generally falls under it, and therefore under Directive (EU) 2016/1629. Whether your assembly is treated that way, and which requirements apply, is decided by the inspection body or the competent authority.

Which stability requirements apply to floating equipment?

Chapter 22 of ES-TRIN contains the special provisions for floating equipment: residual safety clearance and residual freeboard (22.04 and 22.05), the heeling test (22.06), the proof of stability with heel and trim, moments and wind (22.07) and reduced residual freeboard (22.08). National requirements may be stricter; ask the competent authority. Information with sources, not legal advice.

May floating equipment operate without a proof of stability?

Article 22.10 of ES-TRIN allows floating equipment without a proof of stability if the working gear can in no way alter the heeling or trim and any displacement of the centre of gravity can be absolutely excluded. For a crane or hydraulic excavator on a pontoon that is, in principle, not the case.

Read more

Last updated 21 November 2026. StabCal is a tool for work preparation; this article contains general information and is not legal advice or advice for a specific project.

Launch follows shortly

StabCal is in its final test phase. Join the waiting list: you will be the first to hear, and your first basic report is free (one per company, conditions).

Join the waiting list